Presswood Pallet Production Line

15–20 finished pallets per hour, per machine — no fumigation needed

Ask for a Production Plan
WhatsApp Us

Key Specifications

Output: 15–20 finished pallets per hour, per machine
Presses: 800t / 1000t / 1200t options
Finished pallets: meet ISPM15 — export-ready without fumigation
Line scope: mixing, moulding, pressing, finishing
Pallet size range: Custom-made to buyer requirements
Mould options: Custom-made to buyer requirements
Total power: 230 kW (complete line)
Complete line weight: approx. 50 t

Who It Is For

For plants turning sawdust, shavings and wood residues into one-piece moulded pallets instead of selling waste cheap.
One press produces 15–20 finished pallets per hour; scale by adding presses.
Finished pallets meet ISPM15, so export orders skip fumigation and heat-treatment paperwork.

Works With

Pallet Block Production Line

The nailed-pallet route, for buyers who need both.

View line

Automatic Pallet Nailing Line

Assemble pallet lines around the same raw-material stream.

View line

Presswood pallet moulds

Spare and additional moulds for size changes.

View machine

On-Site Footage

presswood hot press machine pressing pallet mould
sawdust pallet block press machine producing blocks
automatic wooden pallet nailing machine running on site

Commercial Terms

Payment: 40% deposit, 60% before shipment
Lead time: about 2 months
Installation: 2–3 engineers, 7–10 days (buyer covers travel + USD 200/engineer/day)
Warranty: 1 year

Ask for a Production Plan

Tell us about your production first — we reply with a line plan.

WhatsApp +86 189 5016 9881
chans@chinawoodcenter.com.cn

    Frequently Asked Questions

    How many pallets per hour?15–20 finished pallets per hour, per machine.
    Do presswood pallets need fumigation?No. Finished presswood pallets meet ISPM15 requirements.
    Which press tonnage do I need?Presses come in 800t / 1000t / 1200t; tell us your pallet size and target output and we return a plan.
    What is the warranty?1 year.
    Do you install and train overseas?Yes, 2–3 engineers for 7–10 days; terms as in the commercial strip above.

    ← Back to all production lines