Xiamen Chans Wood & Machinery Co., Ltd.
Pallet Machinery Supplier for Wood Pallet Factories
Complete production lines for presswood pallets, nailed pallets and pallet blocks — supplied by an integrated manufacturer & trading company.
Our Production Lines
Three complete lines that cover the full pallet factory — run one line, or combine them.
COMPLETE LINEPresswood Pallet Production Line
One-step moulded pallets from wood waste and shavings — no fumigation, nestable, export-ready.
MOST ASKEDAutomatic Pallet Nailing Line
Stringer and block pallets nailed at line speed — one operator feeding, consistent quality.
COMPLETE LINEPallet Block Production Line
Dense sawdust blocks from your own waste wood — steady supply for your nailing line.
Auxiliary Machines
Supporting machines that complete the lines — also sold separately.




Automatic Block Cutter
Cuts long block strips into pallet blocks at speed.
Why Source From Chans
One supplier for complete lines and auxiliary machines.
One Supplier
Complete lines and auxiliary machines from one supplier — one contact, one shipment plan.
Output First
Lines sized by your daily pallet target, not by catalogue models — capacity quoted per your pallet size.
Installed For You
Engineers install the line and train your operators at your factory, 7–10 days on site.
12-Month Warranty
Full-line warranty with spare parts supply and remote support, 08:00–24:00 Beijing time.
Lines Running at Customer Sites
Real lines, real output — photographed at work, not rendered.



How It Works
From first message to a running line in five steps.
Send Your Specs
Pallet size, daily target and your current process.
Get a Proposal
Line configuration, layout and quotation for your case.
Production
About 2 months, with photo and video updates.
Shipment
Balance before shipment, lines packed for sea freight.
Installation
Engineers on site 7–10 days, training included.
Common Questions
What do you need from me for a quote?
Your pallet type and size, target output per day, and how you produce now. That is enough for a first line proposal.
What are the payment terms?
40% deposit to start production, 60% balance before shipment. Lead time is about 2 months plus sea freight.
Do you install overseas?
Yes — 2–3 engineers install and train at your factory in 7–10 days; travel costs and a daily allowance are on the buyer.
Tell Us Your Pallet Size and Daily Target
Send your pallet size and daily output target — we reply with a line configuration and a first quotation.
Contact
Request a Quotation
Replies within one business day. For a faster answer, message us on WhatsApp with your pallet size and daily target.
WhatsApp · +86 189 5016 9881
Email · chans@chinawoodcenter.com.cn
Phone · +86-592-2684631
Address · Room 402, West Section, Lianban Commercial Plaza, Siming District, Xiamen, China
Hours · 08:00–24:00 Beijing time
